EasyManuals Logo
Home>Siemens>Control Panel>SINAMICS Intelligent Operator Panel

Siemens SINAMICS Intelligent Operator Panel User Manual

Siemens SINAMICS Intelligent Operator Panel
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #108 background imageLoading...
Page #108 background image
Options
7.2 Hand-held device
Intelligent Operator Panel (IOP)
108 Operating Instructions, 08/2015, FW V1.6.1, A5E00110011B AF
CAUTION
General precautions
There is a risk of explosion if battery is replaced by incorrect type.
Overcharging, short circuiting, reverse charging, mutilation, or incineration of the cells
and the batteries must be avoided to prevent one or more of the following occurrences;
release of toxic materials, release of hydrogen and/or oxygen gas, rise in surface
temperature.
If a cell or a battery has leaked or vented, it should be replaced immediately using
protective gloves.
If and when necessary, these cells or batteries must be replaced with identical new ones
from the same manufacturer. If a cell or a battery to be replaced is connected with other
cells or batteries in series, it is recommended that the other cells or batteries be
replaced with new ones at the same time.
Battery compartments containing these cells or batteries must be provided with means
of ventilation to prevent possible accumulation of any released gases under abnormal
conditions.
Note
Battery lifetime
With the supplied rechargeable batteries in a fully
-charged state they should last for
approximately 10 hours; the use of normal "AA" batteries may last considerably less time.
Industrial environment
The IOP has been designed for use within a Class A Indus
trial environment only.
Disposal of batteries
The batteries supplied with the IOP must be disposed of in accordance with local and
national environmental policies.
Battery status
The battery status is displayed at the top right
-hand corner of the IOP display.
Battery charging
If the batteries are put on charge and the batteries are fully discharged; the charging unit will
enter a 'pre
-charge' state. During the pre-charge state the LED will not be lit, therefore there
may be a delay before the charging LED lights up.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SINAMICS Intelligent Operator Panel and is the answer not in the manual?

Siemens SINAMICS Intelligent Operator Panel Specifications

General IconGeneral
BrandSiemens
ModelSINAMICS Intelligent Operator Panel
CategoryControl Panel
LanguageEnglish

Related product manuals