EasyManua.ls Logo

Siemens Synco 700 RMZ785 - Combined Examples: H;C Demand, H;C Changeover

Siemens Synco 700 RMZ785
213 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10.5 Combined examples: H/C demand,
H/C changeover
10.5.1 Effect of H/C changeover and controller
If configuration parameter "2-pipe heating/cooling system" is enabled and H/C
demand of RMS705B is sent to the bus, the H/C changeover signal also acts on
the corresponding RMS705B.
Dependencies
Thus, only one sequence is enabled in this controller of the RMS705B (either
cooling or heating).
Controller 3 is connected to a 2-pipe system. Thus, controller 3 can only heat or
only cool. This is enabled by configuring a 2-pipe system and the associated H/C
demand.
Example
You must configure both controllers 3 (heat and refrigeration demand block, see
Sections 10.1 and 10.2 ).
Note
Contrl.
Contrl.
X
X
Main menu > Commissioning > Extra configuration > Aggregates > Heat demand >
Configuration
Operating lin
e Adjustab
le values / Comment
Controller 3 ---, Sequence 1
Main menu > Commissioning > Extra configuration > Aggregates > Refrigeration demand >
Operating line Adjustable values / Comment
Controller 3 ---, Sequence 4
1
2
3
4
5
Bus
68
7
23
Key
Pos Element
1
Heat generation.
2
Refrigeration generation.
3
Changeover valve.
4
Manual changeover to the changeover valve and function block "H/C changeover".
5
Routing the changeover signal "heating/cooling" via the bus.
6
Register, controlled by RMS705B.
7
Effective range of RMS705B.
8
Fan coil unit, e.g. FNC03, controlled by RXB.
163 / 216
Siemens Switching and monitoring device RMS705B CE1P3124en
Building Technologies H/C demand, H/C changeover 01.04.2010

Table of Contents

Related product manuals