12 – 1
12 Auxiliary and control switches
(1) Bell Alarm S24
(2) Cut off switch for remote reset coil S13 (page 10-5)
(3) Signaling switch S22 for 1st shunt trip (page 11-3)
(4) Signaling switch for "Ready-to-close" S20
(5) Signaling switch S23 for 2nd shunt trip or under-voltage release (page 11-3)
(6) Contact position-driven auxiliary switch S1
(7) Contact position-driven auxiliary switch S2
(8) Contact position-driven auxiliary switch S4
(9) Contact position-driven auxiliary switch S3
(1) (4) (5)
(6)
(7)
(8)
(9)
(3)(2)