2-16
Refer to Field Wiring Diagram 842-158 for detailed information and the installation instructions
for each appliance during peripheral appliance installation. The procedure listed below is a
general outline for installing the 4009 peripheral appliances.
1. Determine the mounting locations of the peripheral appliances and install system wires from
the mounting location of each peripheral appliance to the 4009 system board. All wiring must
be minimum 18 AWG, supervised, and power limited.
2. Install all peripheral appliances and connect them to appropriate wires. (Refer to the
installation instructions packed with the appliances.)
System Installation, Continued
Mounting and Wiring
Peripheral
Appliances