MAINTENANCE
1323RE&1623RE Operation Manual 9-3 © Jun. 2021
3. Duplicate the Repair & Inspection Report for each
inspection. Store the completed tables for 10 years
or until the machine is no longer in use or as
required by machine owner/company/custodian.
4. Use the following table to note the results. After
each section is complete, mark the appropriate box.
5. Record the inspection results. If any inspection
results are "NO", the machine must be stopped and
re-inspected after repair is completed and marked
in the box marked "inspection". Select the
appropriate inspection procedure based on the
inspection type.
REPAIR & INSPETION REPORT
Model
Serial No.
Checklist A Procedures
Items
YES/Machine is
in Good
Condition
NO/Machine Has
Damage or
Malfunction
REPAIRED/
Machine Has
Been Repaired
Problem
Description
A-1 Inspect All Manuals
A-2 Inspect All Decals
A-3 Inspect Damaged,
Loose or Lost Parts
A-4 Inspect Hydraulic Oil
Level
A-5 Inspect Hydraulic Oil
Leakage
A-6 Functional Tests
A-7 Perform
Maintenance after 30
Days
Checklist B Procedures
Items
YES/Machine is
in Good
Condition
NO/Machine Has
Damage or
Malfunction
REPAIRED/
Machine Has
Been Repaired
Problem
Description
B-1 Inspect Electrical
Wiring
B-2 Inspect Rim ,Tire and
Fasteners
B-3 Inspect Hydraulic Oil
B-4 Inspect Air filter of
Hydraulic Tank
B-5 Replace High-
Pressure Filter Element
B-6 Inspect the Battery
B-7 Inspect Drive
Reducer Oil Level
B-8 Test Oscillate
Outriggers

Table of Contents