MAINTENANCE
MAINTENANCE SCHEDULE
Components
Intervals
Daily
Every 500h
or 6 months
Every 1000h
or annually
Every 2000h
or bi-
annually
Every 5000h
or 5 years
Every
10000h or 10
years
Safety belt &
helmet
12
1–Check for proper installation
2–Check for damage, cracks, deformation or wear, etc.
3–Check for leaks
4–Check oil level
5–Check battery level
6–Lubricate
7–Drain, clean and refill
8–Replace
9–Tighten
10–Check by testing
11–Check by measuring
12–Verify
13–Check tensioning
14–Overall check (disassembly may be required)
CONDUCTING A PRE-
DELIVERY INSPECTION
When the machine owner/company changes, in addi-
tion to conducting a pre-delivery inspection, the corre-
sponding inspection shall be carried out according to
the maintenance schedule requirement and repair & in-
spection report. When conducting a pre-delivery in-
spection, comply with the following requirements:
1. It is the responsibility of the machine owner/com-
pany to perform a pre-delivery inspection.
2. Follow this procedure each time before delivery.
Performing a pre-delivery inspection could reveal
potential problems with the machine before you be-
gin putting the machine into service.
3. Never use a damaged or malfunctioning machine.
Tag the machine and do not use it.
4. Only professionally trained, qualified personnel may
repair the machine and must follow the procedures
as stated in operation manual and maintenance
manual.
5. A competent operator must conduct daily mainte-
nance on this machine as stated in operation man-
ual and maintenance manual.
Before delivering the machine, complete the following
record using these instructions:
1. Prepare the machine before delivery, which in-
cludes performing a pre-delivery inspection, follow-
ing maintenance procedures and performing
functional inspections.
2. Use the following table to note the results. After
each section is complete, mark the appropriate box.
3. Record the inspection results. If any inspection re-
sults are "NO", the machine must be stopped and
re-inspected after repair is completed and marked
in the box marked "inspection".
Table 9-2
PREPARE THE WORK RECORD BEFORE DELIVERY
Model
Serial No.
Inspection Item
YES/Machine is in
Good Condition
NO/Machine Has Damage
or Malfunction
REPAIRED/Machine
Has Been Repaired
Pre-operational Inspection
Maintenance Procedure

Table of Contents

Other manuals for Sinoboom ML10EJ

Related product manuals