EasyManua.ls Logo

SMA SUNNY BOY 1300TL - Page 25

SMA SUNNY BOY 1300TL
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMA Solar Technology AG Electrical Connection
Installation Guide SB13_21TL-IA-IEN121060 25
7. Attach the pressure screw or cable gland and the threaded sleeve.
8. Insert the protective conductor PE (green-yellow)
into the screw terminal with the grounding sign on
the socket and tighten the screw.
9. Insert the neutral conductor N (blue) into screw
terminal 1 on the socket and tighten the screw.
10. Insert phase L (brown or black) into screw terminal
2 on the socket and tighten the screw.
11. Leave screw terminal 3 on the socket free.
12. Make sure the wires are securely connected.
Size used Procedure
PG13.5 Push the sealing ring into the
fastening case.
Slide the PG13.5 pressure
screw and the fastening case
including the sealing ring
over the AC cable.
Slide the threaded sleeve
over the AC cable.
PG16 Slide the PG16 cable gland
over the AC cable.
Slide the threaded sleeve
over the AC cable.

Table of Contents

Other manuals for SMA SUNNY BOY 1300TL

Related product manuals