SMA Solar Technology AG Commissioning
Installation Guide SB13_21TL-IA-IEN121060 37
6 Commissioning
6.1 Commissioning the Inverter
1. Check the following requirements before commissioning:
The inverter is firmly in place
Correct connection of the AC cable (grid)
All DC cables connected (strings)
Unnecessary DC inputs are closed with the corresponding DC connectors and sealing plugs
The enclosure lid is securely screwed in place
External DC switch-disconnector additionally connected or, if available, the Electronic Solar
Switch (ESS) is firmly in place
The miniature circuit-breaker is laid out correctly
2. Switch on the miniature circuit-breaker.
Green LED glows: commissioning has been successful.
or
Green LED flashes in case of insufficient irradiation: grid connection conditions have not yet
been reached. Wait for sufficient irradiation.
or
The red or yellow LED is glowing or flashing: an error has occurred. Proceed to step 3.
3. Read section 9"Failure Search" (page46) and if necessary eliminate the error or fault.
A Green LED Operation
B Red LED Ground fault or varistor
defective
C Yellow LED Fault