EasyManua.ls Logo

SMA Sunny Boy 3000US - Unpacking and Inspection

SMA Sunny Boy 3000US
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Unpacking and Inspection
SB3000US-4000US-11-SE1607 SMA America 2-1
Section 2:
Unpacking and Inspection
All Sunny Boy inverters are thoroughly tested and inspected before they are packed
and shipped. Although they are shipped in sturdy, recyclable packaging; damage
can still occur during shipping. It is important to carefully inspect the shipping
container prior to beginning the installation. If any external damage to the
packaging makes you suspect the inverter itself could be damaged, or if you find
that the inverter is damaged after unpacking it, report the damage immediately to
your SMA dealer and to the shipping company that delivered the Sunny Boy. If it
becomes necessary to return the Sunny Boy, use the original packaging in which it
was delivered.
WARNING: The Sunny Boy weighs 88 lb. (40 kg). To
avoid injury, be sure to use proper lifting techniques
and secure the help of someone to assist in the unpack-
ing and installation of the inverter.
If you need assistance with a damaged Sunny Boy, contact your SMA dealer or
SMA America. Contact information for SMA America is provided below.
SMA America, Incorporated
12438 Loma Rica Drive
Grass Valley, California 95945
Tel 530.273.4895
Fax 530.274.7271
www.sma-america.com

Table of Contents

Related product manuals