AC Voltage Configuration Opening the Sunny Boy
SB3000US-4000US-11-SE1607 SMA America 4-1
Section 4:
AC Voltage Configuration
Opening the Sunny Boy
1. Remove the four screws and lock washers
from the housing cover and pull the cover
forward smoothly.
2. Place the cover, screws, and lock washers
aside where they will be out of your way
while connecting the wires and cables to
the Sunny Boy.
CAUTION:
Be careful not to misplace the screws or the lock
washers, as all four screws and lock washers are required
to ensure that the cover is grounded properly and is fully
sealed to the case. Handle the cover carefully, as even mi-
nor damage to the cover could result in an inadequate seal
between the cover and the case, thus allowing moisture to
enter the case and damage the sensitive electronic compo-
nents.
CAUTION: Do not install the Sunny Boy during periods of
precipitation or high humidity (> 95%). Moisture trapped
within the enclosure may cause corrosion and damage to
the electronic components.