15 Procedure for Receiving a Replacement Device
SMA Solar Technology AG
Operating Manual STPx0-3SE-40-BE-en-10 121
15 Procedure for Receiving a Replacement Device
Under fault conditions, the product may need to be replaced. If this is the case, you will receive a
replacement device from SMA Solar Technology AG. If you received a replacement device,
replace the defective product with the replacement device as described below.
Procedure:
1. Decommission the defective product (see Section13, page117).
2. Mount the replacement device (see Section6, page33) and make the electrical connections
(see Section7, page37).
3. Commission the replacement device (see Section8.2, page63).
4. If the defective product had been registered by a communication product, replace it with the
new product in the communication product (see operating manual of communication product).
5. Pack the defective product in the packaging of the replacement device and arrange with SMA
Solar Technology AG for it to be picked up.