EasyManua.ls Logo

SMA SUNNY TRIPOWER 5.0 SMART ENERGY - Connecting the Inverter to the Utility Grid

SMA SUNNY TRIPOWER 5.0 SMART ENERGY
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Electrical Connection
SMA Solar Technology AG
Operating Manual STPx0-3SE-40-BE-en-10 39
Procedure:
1. Strip the insulation of the grounding cable. Attach the ring terminal lug to the stripped wire
using the required crimping tool.
2. Tighten the screw with washer and spring washer at
one of the two connection points for the additional
grounding (PH2, torque: 1.5Nm).
7.2.3 Connecting the Inverter to the Utility Grid
Requirements:
The connection requirements of the grid operator must be met.
The grid voltage must be within the permissible range. The exact operating range of the
inverter is specified in the operating parameters.
Procedure:
1. Disconnect the AC and backup miniature circuit breaker from all 3 line conductors and secure
against reconnection.
2. Ensure that the DC load-break switch has been
switched off and secured against reconnection.
3. Ensure that the battery is switched off.
4. Label the AC connector for connection to the utility grid to prevent subsequent confusion with
the AC connector for connection to the backup loads.
5. Unscrew the swivel nut of the AC connector and
remove the terminal from the AC connector.
1
2

Table of Contents

Other manuals for SMA SUNNY TRIPOWER 5.0 SMART ENERGY

Related product manuals