Figure 20
shows the connection of PV strings and
Figure 21
shows the connection of PV
arrays to the Synergy Manager.
Figure 20: Connection of PV strings to the Synergy Manager
Figure 21: Connection of PV arrays to the Synergy Manager
Connection of PV arrays to the Synergy Manager is performed via a combiner box.