Setting
Setting
ALL Test
Test report
Uvp(27.S1) test
Ft: 51.50Hz Tt:1000ms
Fs: 0.00Hz To: 998ms
F0: 0.00Hz pass
>Ofp2(81>.S2)result
Vt: 264.5V Tt: 300ms
Vs: 0.0V To: 200ms
V0: 0.0V pass
>Ovp2(59.S2)result
Vt: 92.0V Tt: 200ms
Vs: 0.0V To: 196ms
V0: 0.2V pass
>Ofp2(27.S2)result
Vt: 195.5V Tt: 400ms
Vs: 0.0V To: 200ms
V0: 0.0V pass
>Uvp2(27.S1)result
Ft: 50.50Hz Tt: 100ms
Fs: 0.00Hz To: 96ms
F0: 0.2Hz pass
>Ofp2(81>S1)result
Ft: 49.50Hz Tt: 100ms
Fs: 0.00Hz To: 98ms
F0: 0.02Hz pass
>Ufp2(81<.S1)result
Ft: 47.50Hz Tt: 400ms
Fs: 0.00Hz To: 3999ms
F0: 0.02Hz pass
>Ufp2(81<.S2)result
Vt: 253.0V Tt: 600ms
Vs: 0.0V To: 598ms
V0: 0.0V pass
>Ovp10(59.S1)result
>OverVoltage_L2
0.0V
Grid
>Vac 10min Avg
0.0V
Grid
94
95
c) Charger
Here the user can set the parameters of charger on this page, the
inverter is compatible with both lithium battery. Users can set the
charge & discharge parameters.
For the detailed parameters, please refer to below table.
>Func Select
>OFF<
GMPPT
Modbus
Baud Rate:
115200
Modbus
Address:
1
j) External ATS
If you want Matebox installed, you need to turn this feature on here.
>Select
External ATS
k) Power Factor (applicable to specific countries, please refer to local grid
requirements.)
Mode Select
> < Off
Power Factor
Mode Select
> <
Over-Excited
Power Factor
Mode Select
> <
Under-Excited
Power Factor
Mode Select
> < Curve
Power Factor
Mode Select
> < Q(u)
Power Factor
h) GMPPT
If the user's PV module is blocked by a fixed object, you can turn on the
shadow tracking setting low, middle, and high here. If there is no object
blocked, please choose to turn off this function.
Enable
Mode Select
> < Fixed Q Power
Power Factor
i) Modbus
Here you select the baud rate of the external communication
protocol, the default location of 19200 and 485 addresses.
g) Self Test (only for CEI 0-21)
The self test function allows users to test the following items. "Full test",
"Ovp(59.S2) test”, "Uvp (27.S1) test", "Uvp (27.S2) test", "Ofp (81>.S1) test",
"Ufp (81<.S1) test", "Ofp (81>.S2) test", "Ufp (81<.S2) test", "Ovp10 (59.S1) test".
In the self-test interface, the user can select "all tests" or a single test item for
testing.
Before testing, make sure that the inverter is connected to the grid.
All tests take about 6 minutes. And it will display "Success" and then "Delivery".
For a single test item, it takes about a few seconds or minutes.
Click "Test Report" to view the test results of all items.