EasyManua.ls Logo

Spectra Tape Series - Chapter 3: Installation Preparation

Spectra Tape Series
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
CHAPTER 3
Installation Preparation
Before the library arrives, make the proper arrangements to ensure the safe
handling and movement of the library and components from the delivery
site (for example, a shipping dock or receiving area) to the location where
the library will be installed.
In preparation for your installation, locate the accessory box included with
the library. This box contains the activation keys for the library options you
purchased and additional information that you should read before the
library is installed. Make sure that you do not lose any of the activation
keys.
The following sections outline the requirements for storing and moving the
library and its components. Make sure that you review these requirements
carefully. This information is provided to ensure that the site of the
installation meets the necessary requirements before the Spectra Logic
field representative arrives.
You can print out the Site Preparation Checklist on page 61 and check off
each item as you complete it.
Task Described beginning on...
Receiving the Library page 22
Unpacking and Moving the Library page 23
Preparation for the Installation page 24
Service Access Requirements page 25
Placement with Existing Equipment page 27
Rack Installation page 27
Chassis Grounding page 28
Updating, Servicing, or Moving the Library page 28

Related product manuals