The T680 ships from the factory in its own rack. Allow a minimum of an
additional 24 inches (61 cm) of clearance at both the front and back of the
rack to open the rack doors.
Chassis Grounding
To ensure proper grounding of the library chassis, one of the following
conditions must be met:
Cord locks must be installed on the AC power cords at the library. The
supply end of each AC power cord and the AC power source outlets
must have locking connectors.
– or –
If your site does not have locking connectors on the AC power source
outlets, you must attach a permanent grounding wire connected from
earth ground to one of the AC switch plates on the back of the library.
UPDATING, SERVICING, OR MOVING THE LIBRARY
Contact Spectra Logic Technical Support before making any changes to
your library hardware or performing any service operations.
Installing Additional Drives
Installing an additional drive into a partially filled DBA causes the library
to reassign element addresses. To avoid errors, reconfigure your backup
software after adding a new drive (refer to your software documentation
for instructions).
Risk of electrical shock. To prevent the possibility of electrical shock, install cord
locks on the AC power cords and a permanent grounding wire between the chassis
and earth ground.
Warnung: Gefahr eines elektrischen Schlages. Um zu verhindern, dass die
Möglichkeit eines elektrischen Schlages, der Installation von Kabel-Sperren auf den
AC Netzkabel und eine ständige Erdung Draht zwischen den Chassis und Masse.