CHAPTER 5
Site Preparation Checklist
Use the following checklist as you prepare for the arrival and installation
of your library.
Prepare for Library Delivery
Refer to Receiving the Library on page 22 for detailed information.
The receiving/storage area can handle the size and weight of the
crated library chassis as well as the crate containing the library
components.
Prepare to Move and Unpack the Library
Refer to Unpacking and Moving the Library on page 23 for detailed
information.
Doorways, stairwells, hallways, and elevators accommodate the size
of the crated library.
Elevators can handle the weight of the crated library.
Transportation equipment (forklift, pallet jack, and/or stair crawler)
is available.
Transportation equipment can handle the weight of the crated
library.
Space is available in the data center to accommodate the size of the
crate and crate ramp, as well as the crate of library components,
with extra space for maneuvering.
Prepare the Data Center
Refer to Site Requirements on page 18 for information related to the
following preparations.
Electrical and peripheral equipment cabling is completed and
organized.
Electrical circuits and outlets meet the library’s specifications.
Fire suppression equipment is in place.