EasyManua.ls Logo

SRAM HydroR - Page 32

SRAM HydroR
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
Hose Installation
Apply grease to the new o-rings and install them onto both sides of the
new banjo.
Install the banjo and hose into the hood.
Align the bladder assembly in the reservoir cover with the reservoir in
the hood.
Install the four reservoir cover bolts at an alternating sequence until a
torque of 1.3-1.5 N·m (11-13 in-lb) is achieved.
Install the hatch cover onto the hood. Tighten the three hatch
DOT grease
DOT grease
2
3
4 mm 3.9-4.4 N·m (35-39 in-lb)
4
5
T10 1.3-1.5 N·m (11-13 in-lb)
Phillips #1 0.1 N·m (1 in-lb)
Phillips #1 0.1 N·m (1 in-lb)
6

Other manuals for SRAM HydroR

Related product manuals