iSTS is powered from two separate sources. It is important that you install correct signage with
the enclosure and the immediate vicinity to warn personnel of this aspect and what isolation,
precautionary processes, and procedures need to be adopted to make the iSTS and equipment
the iSTS safe to work on.
equipment receives power from more than one source. Disconnect output and all input sources of
this equipment before servicing.
not proceed with the installation or operation of the iSTS if it has been damaged. Carefully inspect the
any damage that may have occurred during shipping, unpacking or during and after any
care when handling the iSTS and ensure that it is physically supported during the installation process.
end of the installation process the iSTS should be firmly and securely fixed to the wall or the panel.
the cables are securely connected and supported and all covers plates are replaced. There should
live exposed or accessible contacts that could cause electrical shock if contact is able to be made. This
designed for fixed wiring installation only.
equipment is not suitable for installation into environments that utilise RCD earth leakage detectors
inputs of the static transfer switch. Consult Static Power for special considerations.
EARTH CONNECTION IS ESSENTIAL BEFORE WORKING ON CIRCUITS
OR CONNECTING / DISCONNECTING SUPPLIES.
TREAT AC INCOMING LEADS AS LIVE IF DISCONNECTING FROM SOURCE.