EasyManua.ls Logo

Stihl 034 Series - Page 36

Stihl 034 Series
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36 034, 036, 036 QS
Pull ground wire connector
sleeve out of contact spring.
VA
138RA092
On machines with handle or
carburetor heating, disconnect
the pin and socket connectors of
the heating systems - see 10.3.
Pull grommet out of tank housing.
Slip grommet off the wires.
VA
138RA211
Pull the boot off the spark plug
and remove the ignition lead from
its seat in the crankcase.
Pull the insulating tube through
the cable gland in the crankcase.
Removing the short circuit wire:
Disconnect short circuit wire from
ignition module.
Pull short circuit wire out of
retainer on ignition module.
VA
138RA104
Pull the short circuit wire through
the insulating tube.
Install in the reverse sequence.
Note:
A ground wire is installed because
the contact spring in the polymer
tank housing is not connected to
ground on the ignition module.
Removing the ground wire:
Take out the screw (1) and
remove the ground wire (2).
VA
138RA093
2
1
Pull the ground wire out through
the insulating tube.
Install the new ground wire in the
reverse sequence. Check that
the insulating tube is properly
located in the crankcase cable
gland.
Important:
Use an ohmmeter to check correct
operation of the ground and short
circuit wires as well as the STOP
contact.
Set the ohmmeter to measuring
range " x 1".
Clip one of the two test leads to
the contact spring (1).
VA
138RA094
1
Clip the other test lead to the
ground wire terminal.
VA
138RA095

Table of Contents

Related product manuals