EasyManua.ls Logo

Strand Lighting Wallrack - Installation Procedure; Supply Connections

Strand Lighting Wallrack
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wallrack User Manual
Installation Procedure
After unpacking the rack, remove the front panel (6 screws) and the Earth
leads attached to it.
The rack(s) should be secured to the wall before installation
Power wiring: Top
Control wiring: Bottom
Supply Connections
Wallrack s are equipped with terminals for Single or Three phase plus
Neutral and Earth connections.
24x2.5kW Wallrack 6x5kW Wallrack
Single Phase: 120A Single Phase: 150A
Three Phase: 90A Three Phase: 50A
For single phase, there will be an optional single phase kit. The terminals
are provided for (2.5kW dimmers are 25 mm
2
, 5kW dimmers are 32mm
2
)
wires of the NEUTRAL and PHASE terminals.
Three Phase
Conductor sizes must be chosen to comply with local regulations and are
usually calculated to take into consideration cable lengths and types.
Typically, wiring for 3 PHASE LIVE conductors should be 25mm
2
for
2.5kW dimmers and 32mm
2
for 5kW dimmers maximum rack load
capacity.
User Manual v1.2 March 2006 7

Other manuals for Strand Lighting Wallrack