EasyManua.ls Logo

Stratus ftServer 4900 Series - Figure 9-5. Cage Nut Locations: PDU

Default Icon
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing PDUs (Optional)
9-8 Stratus ftServer 29x0, 49x0, and 69x0 Systems: Site Planning and Installation Guide (R786)
To install a PDU
1. For each PDU, insert four cage nuts in the rear vertical cabinet rails. Insert two
cage nuts in each rear rail, in the top and bottom holes of U positions 1 and 2. The
locations in which to install the cage nuts for two PDUs are indicated in Figure 9-5.
Figure 9-5. Cage Nut Locations: PDU
NOTE
To insert cage nuts, position them so that the tabs are on
the top and bottom (Figure 9-6). Then insert the cage nut
so that its top overlaps the vertical rails, and use a
cage-nut insertion tool or your fingers to pull the rest of the
cage nut through so that the bottom tab overlaps the
vertical rail.
cnut002a
1
2

Table of Contents

Related product manuals