EasyManua.ls Logo

Strautmann PP 1208 - Page 36

Default Icon
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation and control
V 152 10 11 Rev.: END
5-7
Attach the free end of thread behind
the thread clamp on the chamber
door.
Fig. 5-9: Thread clamp on chamber door
5.4.1.1 Tying with wire
Open the bale chamber door
Take the ejector on the two-hand control buttons and switch MANUAL and
PRESSPLATE high
Inserting the twine

Table of Contents

Other manuals for Strautmann PP 1208

Related product manuals