Operation and control
V 152 10 11 Rev.: END
5-12
Turn the locking wheel in the given
direction.
Open the press chamber door.
or:
Open the press chamber door using
the two-handed control (with
hydraulic door lock).
Information!
Open the press chamber door
more than 100° for subsequent
bale removal
Fig. 5-11: Open press chamber door
Tying up the bale:
Loosen the tapes from the spring plates on the front of the door.
Pull the tape pull hook out of the tape channel.
Cut the binding thread to a length of approx. 1.4 m.
Hook the tape pull hook onto the holder above the gantry press.
For tying up, pull the two tapes until they are taut and tie a knot in the ends of the
thread.
Information!
Make absolutely sure that you cut through both ends of the thread
5.4.4
Removing bale, finishing work
Place a euro pallet in front of the gantry press
Use the two-handed control Manual mode button and the Raise shield button to
move the shield upwards. Press the two buttons at the same time (within 0.5
seconds).
Keep pressing the buttons until the completed bale has been discharged onto the
pallet.