Servicing
V 152 10 11 Rev.: END
6-10
Interval Component Activities
Clean the press chamber area
Clean the pressing shield area
Hydraulic
system
Check the hydraulic system for signs of leaks.
Check the hoses, replace them if necessary.
Check the oil level, top up if necessary.
Annually Hydraulic
system
Check the oil level
Check the filter system's filter contamination
indicator, change the filter if necessary.
Perform a leak test on the overall system
Check the cylinders for signs of leaks and wear.
Inspect the hoses, replace them if necessary.
Clean the hydraulics
Loading door
guide system
Check the plastic slide rails.
Check the guide clearance, adjust if necessary.
Sliding door Check the function of
the index bolt (1)
Press
chamber door
Clean and lubricate
the spindle on the
locking wheel
Lubricate the hinges
of the press chamber
door
6.5
Repairs
Repair work on the gantry press may only be performed by trained and authorised
technicians of the plant operator. The instructions in this chapter are limited to
important general information and instructions which must be followed for repair work.