TABLE OF CONTENTS
PAGE
Section 3
SPECIFICATIONS
(CONTINUED) 24 Figure 3-2B Piping and Instrumentation- LS-200 and
VCC-200 Air-cooled with Supervisor Controller
26 Figure 3-2C Piping and Instrumentation- LS-200 and
VCC-200 Water-cooled with Electro-mechanical Controller
30 Figure 3-2D Piping and Instrumentation- LS-200 and
VCC-200 Water-cooled with Supervisor Controller
34 Figure 3-3A Identification- LS-200 and VCC-200 Air-cooled
with Supervisor Controller (and Optional Enclosure)
35 Figure 3-3B Identification- LS-200 and VCC-200 Water-cooled
with Supervisor Controller (and Optional Enclosure)
Section 4
INSTALLATION
37 4.1 MOUNTING OF COMPRESSOR
37 4.2 VENTILATION AND COOLING
37 4.3 SERVICE AIR PIPING
37 4.4 COUPLING ALIGNMENT CHECK
37 4.5 FLUID LEVEL CHECK
38 4.6 ELECTRICAL PREPARATION- ELECTRO-
MECHANICAL
39 4.7 ELECTRICAL PREPARATION- SUPERVISOR
39 4.8 MOTOR ROTATION DIRECTION CHECK- STANDARD
ELECTRO-MECHANICAL
39 4.9 MOTOR ROTATION DIRECTION CHECK- SUPERVISOR
CONTROLLER
Section 5
SUPERVISOR 
CONTROLLER
40 Figure 5-1 Supervisor Controllerâ„¢ Control Panel
Section 6
OPERATION-
ELECTRO-MECHANICAL 43 6.1 GENERAL INTRODUCTION- ELECTRO-MECHANICAL
43 6.2 PURPOSE OF CONTROLS GUIDE- ELECTRO-MECHANICAL
45 6.3 INITIAL START-UP PROCEDURE
45 6.4 SUBSEQUENT START-UP PROCEDURE
45 6.5 SHUTDOWN PROCEDURE
Continued ...