EasyManua.ls Logo

Sullair LS-200 - Page 4

Sullair LS-200
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TABLE OF CONTENTS
PAGE
Section 3
SPECIFICATIONS
(CONTINUED) 24 Figure 3-2B Piping and Instrumentation- LS-200 and
VCC-200 Air-cooled with Supervisor Controller
26 Figure 3-2C Piping and Instrumentation- LS-200 and
VCC-200 Water-cooled with Electro-mechanical Controller
30 Figure 3-2D Piping and Instrumentation- LS-200 and
VCC-200 Water-cooled with Supervisor Controller
34 Figure 3-3A Identification- LS-200 and VCC-200 Air-cooled
with Supervisor Controller (and Optional Enclosure)
35 Figure 3-3B Identification- LS-200 and VCC-200 Water-cooled
with Supervisor Controller (and Optional Enclosure)
Section 4
INSTALLATION
37 4.1 MOUNTING OF COMPRESSOR
37 4.2 VENTILATION AND COOLING
37 4.3 SERVICE AIR PIPING
37 4.4 COUPLING ALIGNMENT CHECK
37 4.5 FLUID LEVEL CHECK
38 4.6 ELECTRICAL PREPARATION- ELECTRO-
MECHANICAL
39 4.7 ELECTRICAL PREPARATION- SUPERVISOR
39 4.8 MOTOR ROTATION DIRECTION CHECK- STANDARD
ELECTRO-MECHANICAL
39 4.9 MOTOR ROTATION DIRECTION CHECK- SUPERVISOR
CONTROLLER
Section 5
SUPERVISOR
CONTROLLER
40 Figure 5-1 Supervisor Controllerâ„¢ Control Panel
Section 6
OPERATION-
ELECTRO-MECHANICAL 43 6.1 GENERAL INTRODUCTION- ELECTRO-MECHANICAL
43 6.2 PURPOSE OF CONTROLS GUIDE- ELECTRO-MECHANICAL
45 6.3 INITIAL START-UP PROCEDURE
45 6.4 SUBSEQUENT START-UP PROCEDURE
45 6.5 SHUTDOWN PROCEDURE
Continued ...

Table of Contents

Related product manuals