EasyManua.ls Logo

Supermicro A+ Server AS -1115CS-TNR - Page 31

Supermicro A+ Server AS -1115CS-TNR
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
Chapter 3: Maintenance and Component Installation
4. Remove the external cap from the rail frame by pulling it upwards through the rail guides
on the rail frame.
5. The CPU package is shipped from the factory with the carrier frame pre-assembled.
Grip the handle of the carrier frame/CPU package assembly from its shipping tray, and

frame so its pins will be at the bottom when the rail frame is lowered later.
6. Slide the carrier frame/CPU package downwards to the bottom of the rail frame. Ensure

External Cap
Carrier Frame/
CPU Package
PnP Cover Cap

Table of Contents

Related product manuals