5-1
<Chapter 5: Rack Intallation>
Chapter 5
Rack Installation
This chapter provides instructions for preparing and mounting your chassis in a rack.
5-1 Unpacking the System
You should inspect the box the chassis was shipped in and note if it was damaged
in any way. If the chassis itself shows damage, le a damage claim with the carrier
who delivered it.
5-2 Preparing for Setup
Decide on a suitable location for the rack unit that will hold your chassis. It should
be a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical
noise and electromagnetic elds are generated. A nearby grounded power outlet.
is required
The box your chassis was shipped in should include two sets of rail assemblies, two
rail mounting brackets and the mounting screws to mount the system into the rack.
Please read this chapter in its entirety before beginning the installation procedure.
Choosing a Setup Location
Leave at least 25 inches clearance in front of the rack to open the front door
completely.
Leave approximately 30 inches of clearance in the back of the rack to allow for
sufcient airow and access for servicing.
It should be a restricted access location, such as a dedicated equipment room
or a service closet.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Supermicro SC826BE1C-R920LPB and is the answer not in the manual?

Supermicro SC826BE1C-R920LPB Specifications

General IconGeneral
BrandSupermicro
ModelSC826BE1C-R920LPB
CategoryChassis
LanguageEnglish

Related product manuals