EasyManuals Logo

Supermicro SC826BE1C-R920LPB User Manual

Supermicro SC826BE1C-R920LPB
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #66 background imageLoading...
Page #66 background image
SC826 Chassis Manual
5-6
1
3
1
4
1
4
1
2
Inner Rails
Figure 5-3. Installing the Inner Rails
Installing the Inner Rails on the Chassis
Installing the Inner Rails
1. Identify the left and right inner rails. They are labeled.
2. Place the inner rail rmly against the side of the chassis, aligning the hooks on
the side of the chassis with the holes in the inner rail.
3. Slide the inner rail forward toward the front of the chassis until the quick release
bracket snaps into place, securing the rail to the chassis.
4. Optionally, you can further secure the inner rail to the chassis with a screw.
5. Repeat for the other inner rail.
Figure 5-4. Inner Rails Installed on the Chassis

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Supermicro SC826BE1C-R920LPB and is the answer not in the manual?

Supermicro SC826BE1C-R920LPB Specifications

General IconGeneral
BrandSupermicro
ModelSC826BE1C-R920LPB
CategoryChassis
LanguageEnglish

Related product manuals