EasyManua.ls Logo

Suzuki DF200 - Page 45

Suzuki DF200
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PERIODIC MAINTENANCE 2-13
OCV (Oil control valve)
On the DF250 model, install gasket and OCV, and then
tighten bolts securely.
NOTE:
Position the projection of OCV gasket as shown the right.
#
" OCV bolt: 12 N·m (1.2 kg-m, 8.6 lb-ft)
Collector assembly
Install the collector assembly. (See page 6-5, 6-7.)
Checking
All parts removed have been returned to their original posi-
tions.
Check hose and wire routing. (See page - .)
Check oil leakage.
Do not re-use OCV gasket. Always replace with new
one.
1. OCV gasket
1
1
1. Collector assembly

Table of Contents

Other manuals for Suzuki DF200

Related product manuals