EasyManua.ls Logo

Suzuki DF200 - Page 59

Suzuki DF200
133 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PERIODIC MAINTENANCE 2-27
4. Start engine and allow to warm up as follows:
Summer : 5 min. at 2 000 r/min.
Winter : 10 min. at 2 000 r/min.
5. After warming up, shift into forward gear and increase
engine speed to 3 000 r/min., then compare pressure indi-
cated on gauge to specifications.
6. After testing, reinstall oil pressure switch.
(See page 3-69.)
Monitor-tachometer

Table of Contents

Other manuals for Suzuki DF200

Related product manuals