EasyManua.ls Logo

Suzuki RGV250T 1996 - Page 146

Suzuki RGV250T 1996
334 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7·1
9
CHASSIS
REMOVAL
AND
DISASSEMBLY
Remove the fairing. (Refer
to
page
7·1.)
Remove the
front
wheel. (Refer
to
page
7·3.)
Remove the
front
fork. (Refer
to
page
7·13.)
Remove the meter assembly by loosening three bolts.
09900·00401: L·type hexagon wrench
set
Disconnect the
lead
wires
of
the meter assembly and the
headlight assembly.
Remove the headlight assembly.
Using a center punch
and
hammer, remove the
bolt
to
detach the ignition switch
from
the steering stem upper
bracket.
Remove the
front
brake
hose
connector
by
loosening
two
bolt.
~~m"
, r
Pune
;
___
'\~.~
To"
bolt

Table of Contents

Related product manuals