EasyManua.ls Logo

Suzuki RGV250T 1996 - Page 44

Suzuki RGV250T 1996
334 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3·11
ENGINE
Connect
all
the
cables
to
the
actuator pulley @ properly.
Cable
CD
identification marking: (12C-l)
· Cable
@ identification marking: (12C-2)
Cable
@ identification marking: (12C-3)
Cable
@ identification marking: (12C·4)
Mount
the
pulley @ on
the
actuator.
Tightening
torque:
4 - 6 N·m (0.4 -
0.6
kg·m)
Install
the
actuator
assembly ®
to
the
electric parts holder.
With
the
actuator mounted, install
the
electric part holder
(j) on
the
frame.
I nstall
the
thermostat case
®.
Assemble
the
throttle cable pulleys.
Throttle
cable pulley ®
·
Oil
pump
pulley ®
Actuator
pulley
(j])
· Spring @
Insert
the
pulley shaft
in
position.
Connect
the
cables.
Throttle
cable No. 1: @
·
Throttle
cable No. 2: @
Throttle cable No. 3: @
Actuator cable @
Oil
pump cable @
Cover
the
junction box properly with its cap.

Table of Contents

Related product manuals