• Coat the crankcase upper half mating surface @
with
SUZUKI BOND No. 1215.
NOTE:
*
SUZUKI
BOND No. 1215 should be coated evenly and con-
tinuously.
*
Care
should be taken
not
to
apply
SUZU
K I BOND No. 1215
so
thick
as
to
block
the
oil
passage
®.
* Do
not
coat
SUZUKI
BOND No. 1215 in the
area
shown
as@.
•
Press
in the dowel pin @ by hand.
• Position the upper crankcase half properly
and
tighten the
bolts.
When
tightening, proceed
with
larger diameter bolts,
then smaller bolts. With the
same
diameter bolts in one
group, tighten them evenly in a diagonal fashion.
Initial
12-16N·m
Crankcase
8mm
tightening
(1.2 - 1.6 kg-m)
bolt
Final
20-
24 N·m
tightening
tightening
(2.0 - 2.4 kg-m)
torque
0.9 - 1.3 N·m
6mm
(0.9 - 1.3 kg-m)
• Assemble the following parts:
Primary drive
gear
washer
@;
Key (J); Primary drive
gear
®;
Lock washer ® and Primary drive
gear
nut
®.
Tightening torque: 60 - 80 N·m (6 - 8 kg-m)
ENGINE
3-38