EasyManua.ls Logo

Takeuchi TB23R - Page 83

Takeuchi TB23R
190 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
81
OPERATION
Operating Procedures
Leveling
1. Bring the hoe attachment close to the
body.
2. Gradually remove the dirt from the side of
the mound.
3. Once the mound is low, remove the dirt
from the top. If the load on the body is
too heavy, adjust by raising or lowering
the dozer blade.
E4D053

Table of Contents

Other manuals for Takeuchi TB23R

Related product manuals