EasyManua.ls Logo

Talius Rollshutter - Section 3: Through Wall Operator Applications

Default Icon
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rollshutter Installation Instructions, 6
©Copyright TALIUS
Note: For some face of wall applications we suggest flashing to prevent water build up behind the Rollshutter. Talius
does not supply traditional flashing material but L-sill can be used in its place if needed.
Section 3: Preparation for Through Wall Operator Applications
In this section, determine how the operator exits the Rollshutter and interacts with the surrounding wall. If the
operator does not penetrate a wall, ignore this section.