VOT1; Rev 1.5; EN; 5.11.2015
TKT66 ā Installation and maintenance
APPENDIX 8: Menu selections
Batt. Test
start , 2/3
duration time
Batt.
Test
start ,
full
duration
time
Batt.
Test
start , to
deep
discharge
limit
Batt.
Test
cancel /
batt.
error
confirm
first digit, luminaire
test interval
luminaire and
battery test
manually
luminaire
and battery
test
automatically
luminaire test
automatically,
battery test
manually
luminaire
test
manually,
battery test
automatically
6 Sensitivity
7 Luminaire test time
8 Delay time
9 Cent. Number
10 Battery level
11 Duration
12 Years
13 Months
14 Days
15 Huors
16 Minutes
To set year. Last two digits of year (e.g. 12 = 2012)
Sensitivity value selection in circuit monitoring. See instructions in chapter 5.3.
Luminaire test time selection. Press SET button until correct time is selected. E.g. 15=15.00=3pm.
Delay time when switching from battery operation to mains voltage. Value in minutes.
Central Battery Unit individual number. Useful in reports and central monitoring systems.
Voltage level that battery test stops. Default is 210V(recommendation). Value is 200V + selection. E.g. your selection
is 20 -> battery test stop level is 200V + 20 V = 220V.
Selection of duration time, 1h or 3h battery operation time.