Do you have a question about the TESTO 350 S and is the answer not in the manual?
Brand | TESTO |
---|---|
Model | 350 S |
Category | Measuring Instruments |
Language | English |
Details analyser box components: power supply, connections, filters, and gas preparation.
Describes analyser box controls, connections, and LED status indicators for power and measurement.
Details control unit components: power supply, connections, keypad, and display.
Describes control unit controls, connections, display, and status indicators for operation.
Explains keypad functions, number/letter input dialogues, and parameter entry for configuration.
Details selection of menu items and navigation through the control unit's operating menus.
Instructions for powering the analyser box via mains adapter or rechargeable battery pack.
Instructions for powering the control unit via mains adapter, batteries, or rechargeable pack.
Steps for establishing the databus connection and performing a system check between Control Unit and analyser box.
Procedure for connecting probes before power-on and the initial system startup sequence.
Procedures for switching off the instrument and using an external DC voltage source for power.
Setting the bus address for analyser boxes and selecting connected instruments in the system.
Configuration steps for setting system language, date, and time on the Control Unit.
Customizing function keys by assigning operations from the function bar for quick access.
Procedures for renaming system components and setting up new measurement locations in the system.
Selecting a measurement location and specifying the type of fuel for analysis.
Customizing the display sequence and configuring the printer settings for output.
Detailed steps for conducting a spot measurement of flue gas using the control unit.
Procedure for performing a leak test and general operating steps for spot measurements.
Procedures for reading out, saving, and managing stored measurement data.
Instructions for performing long-term flue gas analysis using the control unit and its programming.
Steps for programming, restarting, and deleting long-term measurement programs.
Procedure for restarting a previously programmed measurement program.
Procedure for deactivating or deleting programmed measurement settings.