EasyManua.ls Logo

Thermo King RD-II SR 30 EEC - Engine Speed Adjustments; Engine Speed Adjustment Procedures; Fuel Solenoid Parts List

Thermo King RD-II SR 30 EEC
136 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Engine Maintenance (Rev. 04/03)
59
Engine Speed Adjustments
Low Speed Adjustment
1. Start the unit and let it run until the engine is warmed
up.
2. Set the thermostat to make the engine run in low speed
and check the engine speed. The engine speed should
be 1625 ± 25 rpm.
3. If the engine speed is not correct, loosen the jam nut on
the low speed adjustment screw.
4. Turn the low speed adjustment screw to change the
engine speed. Turn the screw in to increase the engine
speed. Turn the screw out to decrease the engine speed.
5. Set the engine speed at 1625 ± 25 rpm and tighten the
jam nut.
Integral Fuel Solenoid Parts List
Part
Description
Part
Number Quantity
Fuel Stop Solenoid 41-1386 1
O-ring 33-2770 1
Throttle Solenoid 44-9181 1
Relay 44-9111 1
High Speed Adjustment
1. Start the unit and let it run until the engine is warmed
up.
2. Set the thermostat to make the engine run in high speed
and check the engine speed. The engine speed should
be 2425 ± 25 rpm.
3. If the engine speed is not correct, loosen the jam nut at
the end of the adjuster.
4. Unbolt the adjuster from the throttle lever and turn to
adjust the engine speed. Reinstall on the throttle lever.
5. Set the engine speed at 2425 ± 25 rpm and tighten the
jam nut.

Table of Contents

Related product manuals