EasyManuals Logo

Thermo Scientific TSQ Quantum XLS Pre-Installation Requirements Guide

Thermo Scientific TSQ Quantum XLS
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
Thermo Scientific TSQ Quantum XLS and TSQ Quantum GC Preinstallation Requirements Guide 1
1
Introduction
The TSQ™ Quantum XLS and TSQ Quantum GC systems are designed to operate under
carefully controlled environmental conditions.
As the purchaser, you are responsible for providing a suitable location, a suitable operating
environment, a source of power of acceptable quality, correct gas and solvent supplies, and
proper waste and exhaust systems.
For additional information, request specific preinstallation support directly through your local
Thermo Fisher Scientific office.
CAUTION Operating a system or maintaining it outside the power and operating
environment specifications described in this guide might cause failures of many types. The
repair of such failures is specifically excluded from the standard warranty and service
contract coverage.

Other manuals for Thermo Scientific TSQ Quantum XLS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Thermo Scientific TSQ Quantum XLS and is the answer not in the manual?

Thermo Scientific TSQ Quantum XLS Specifications

General IconGeneral
BrandThermo Scientific
ModelTSQ Quantum XLS
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals