7
Installation
Installation Kits
Thermo Scientific TSQ Quantum XLS and TSQ Quantum GC Preinstallation Requirements Guide 27
11. Main power is installed and is in compliance with local electrical codes.
12. Installation of power for test and cleaning equipment is complete.
13. Power outlets are correctly configured.
NEMA type:
14. Voltage of power outlet has been measured.
Measured voltage:
15. There are no fluctuations in power because of slow changes in the average voltage or
changes as a result of surges, sags, or transients.
16. All required gases (helium and argon) are on site, with gas lines installed and appropriate
gas regulators available.
List gases and their purity:
17. A suitable fume exhaust system is present.
18. The lab complies with all relevant safety regulations.
19. Your TSQ Quantum XLS or TSQ Quantum GC system is on site.
20. The principal operator is available during the installation and certification period.
Installation Kits
The following kits are shipped with the TSQ Quantum XLS and TSQ Quantum GC
systems:
• MS Ship Kit (P/N 70111-62033): Contains installation components, such as the exhaust
tubing and power cords.
• Accessory Kit (P/N 70111-62077): Contains parts such as fittings, tubing, and tools.
• Standard Chemicals Kit (P/N 70111-62078): Contains the necessary chemicals for
demonstrating system performance specifications. The Chemicals Kit is located in the
Accessory Kit box.
• GC Ship Kit (P/N 70111-62079): Contains the transfer line insulation and transfer line
cover.
)
Note You are responsible for replacing any consumables used during the installation.