7
Installation
Installation
28 TSQ Quantum XLS and TSQ Quantum GC Preinstallation Requirements Guide Thermo Scientific
Installation
Once your new TSQ Quantum XLS or TSQ Quantum GC system is on site and ready for
installation, a Thermo Fisher Scientific field service engineer installs it.
During the installation, the field service engineer demonstrates the following:
• The basics of equipment operation and routine maintenance
• The installation specifications that are in effect when you purchased the system
Do not use your new system for sample analysis until the installation is complete and you
have signed the Acceptance Form.
Preventive Maintenance
You are responsible for the routine and preventive maintenance of your TSQ Quantum XLS
or TSQ Quantum GC system.
Regular preventive maintenance is essential. It increases the life of the system, maximizes the
uptime of your system, and provides optimum system performance. The following manuals
cover maintenance techniques:
• TSQ Quantum XLS and TSQ Quantum GC User Guide
• Manuals that come with other modules of your system
Note To receive maximum benefit from this on-site training opportunity, Thermo Fisher
Scientific recommends that the instrument operator be available during the entire
installation process.