EasyManuals Logo

Thermo Scientific TSQ Quantum XLS Pre-Installation Requirements Guide

Thermo Scientific TSQ Quantum XLS
50 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #44 background imageLoading...
Page #44 background image
7
Installation
Installation
28 TSQ Quantum XLS and TSQ Quantum GC Preinstallation Requirements Guide Thermo Scientific
Installation
Once your new TSQ Quantum XLS or TSQ Quantum GC system is on site and ready for
installation, a Thermo Fisher Scientific field service engineer installs it.
During the installation, the field service engineer demonstrates the following:
The basics of equipment operation and routine maintenance
The installation specifications that are in effect when you purchased the system
Do not use your new system for sample analysis until the installation is complete and you
have signed the Acceptance Form.
Preventive Maintenance
You are responsible for the routine and preventive maintenance of your TSQ Quantum XLS
or TSQ Quantum GC system.
Regular preventive maintenance is essential. It increases the life of the system, maximizes the
uptime of your system, and provides optimum system performance. The following manuals
cover maintenance techniques:
TSQ Quantum XLS and TSQ Quantum GC User Guide
Manuals that come with other modules of your system
Note To receive maximum benefit from this on-site training opportunity, Thermo Fisher
Scientific recommends that the instrument operator be available during the entire
installation process.

Other manuals for Thermo Scientific TSQ Quantum XLS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Thermo Scientific TSQ Quantum XLS and is the answer not in the manual?

Thermo Scientific TSQ Quantum XLS Specifications

General IconGeneral
BrandThermo Scientific
ModelTSQ Quantum XLS
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals