W415-0865 / B / 05.26.11
2
NOTE: Changes, other than editorial, are denoted by a vertical line in the margin.
TABLE OF CONTENTS
1.0 INSTALLATION OVERVIEW 3
1.1 STOVE 3
1.2 INSERT 4
2.0 INTRODUCTION 5
2.1 DIMENSIONS 6
2.1.1 STOVE 6
2.1.2 INSERT (COMPLETE WITH FLASHING) 6
2.2 SPECIFICATIONS 7
2.3 GENERAL INSTRUCTIONS 7
2.4 GENERAL INFORMATION 8
2.4.1 FUEL 8
2.4.2 PELLET SPECIFICATIONS 9
2.4.3 CORN SPECIFICATIONS 9
2.4.4 SAFETY FEATURES 10
2.4.5 EPA COMPLIANCE 10
2.5 RATING PLATE INFORMATION 10
3.0 INSTALLATION PLANNING 11
3.1 INSTALLATION OPTIONS 11
3.2 APPLIANCE PLACEMENT 11
3.3 MINIMUM CLEARANCE TO COMBUSTIBLES 12
3.3.1 STRAIGHT INSTALLATION 12
3.3.2 CORNER INSTALLATION 12
3.4 FLOOR PROTECTION REQUIREMENTS INSTALLATION 13
3.5 OUTSIDE AIR 13
3.6 MOBILE HOME 13
4.0 VENTING 14
4.1 TYPE OF VENT 14
4.2 INSTALLING THE PELLET VENT 14
4.3 VENTING THE PELLET APPLIANCE 14
4.4 PELLET VENT TERMINATION 15
4.5 VENT TERMINAL CLEARANCES 15
4.6 STOVE VENTING INSTALLATION EXAMPLES 16
4.6.1 HORIZONTAL TERMINATION (THROUGH WALL) 16
4.6.2 VERTICAL RISE HORIZONTAL TERMINATION (THROUGH WALL) 16
4.6.3 VERTICAL TERMINATION 17
4.6.4 CLASS A CHIMNEY RETROFIT 17
4.6.5 HEARTH MOUNT INSTALLATION 18
4.7 INSERT VENTING INSTALLATION EXAMPLES 19
4.7.1 TYPICAL EXISTING MASONRY INSTALLATION 19
4.7.2 FACTORY BUILT FIREPLACE 20
5.0 FRAMING (INSERT ONLY) 21
5.1 INSTALLATION INTO A COMBUSTIBLE ENCLOSURE 22
5.2 MINIMUM ENCLOSURE CLEARANCES 23
5.3 MINIMUM CLEARANCE TO COMBUSTIBLES 23
5.4 MINIMUM MANTEL CLEARANCES 24
5.5 ALCOVE INSTALLATION REQUIREMENTS (MINIMUM) 24
6.0 FINISHING 25
6.1 INSTALLING VIEWING DOOR 25
6.2 DOOR HANDLE INSTALLATION 26
6.3 DECORATIVE INSET 26
6.4 FLASHING INSTALLATION 27
7.0 WIRING DIAGRAM 28
8.0 OPERATING INSTRUCTIONS 29
8.1 PROPER PELLET LOADING 29
8.2 PRE-START CHECK 29
8.3 LIGHTING APPLIANCE MANUALLY 29
8.4 LIGHTING INSTRUCTIONS 30
8.5 CONTROLS 30
8.6 CONTROL ADJUSTMENT 31
8.7 INSTALLING A THERMOSTAT 31
8.8 SHUTDOWN INSTRUCTIONS 31
9.0 NORMAL OPERATING SOUNDS 32