W415-0865 / B / 05.26.11
3
1.0 INSTALLATION OVERVIEW
Door, see “FINISHING - INSTALLING
THE VIEWING DOOR” section.
Venting, see “GENERAL VENTING”
and “INSTALLATION” sections.
Floor, see “INSTALLATION PLANNING -
FLOOR PROTECTION REQUIRE-
MENTS” section.
See “OUTSIDE AIR”
section.
Handle, see “DOOR
HANDLE INSTALLATION”
section.
Rating plate, see
“RATING PLATE
INFORMATION”
section.
1.1 STOVE
10.0 MAINTENANCE 33
10.1 DAILY (WHENEVER USING THE APPLIANCE) 33
10.1.1 DISPOSAL OF ASHES 33
10.1.2 INSPECT THE BURN POT 33
10.1.3 CARE OF GLASS 33
10.1.4 CLEANING THE HEAT EXCHANGER TUBES 34
10.1.5 MAKE SURE PELLETS ARE NOT PILING UP 34
10.1.6 CLEANING THE BURN POT 35
10.2 BI-WEEKLY (OR EVERY 10 BAGS OF PELLETS) 35
10.2.1 VACUUM FIREBOX 35
10.3 SEMI-ANNUALLY (OR EVERY TWO TONS OF PELLET) 36
10.3.1 VACUUM HOPPER 36
10.3.2 SOOT AND FLY ASH FORMATION 36
10.3.3 CLEAN THE VERTICAL EXHAUST DUCT 36
10.3.4 CLEAN THE EXHAUST BLOWER 37
10.3.5 CHECK ALL SEALS 37
10.3.6 CLEAN THE VENT 38
10.4 IN THE EVENT OF A JAMMED AUGER 38
11.0 REPLACEMENTS 39
12.0 TROUBLESHOOTING 41
13.0 WARRANTY 44
14.0 SERVICE HISTORY 45