EasyManuals Logo

Topcon DL-502 User Manual

Topcon DL-502
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #48 background imageLoading...
Page #48 background image
47
Surveying
9 Press or .
Elevation set-out is completed. Set
out the next ground point.
When in this menu and setting-out has already been taken (for
the second or subsequent reading):
Step 4: The previous backsight measurement will be displayed
and the program skips to step 5.
Storing backsight elevation:
Step 3: Even after power off, backsight elevation is stored.
Since this value is the same as the value in the
elevation measurement mode, the backsight elevation
is stored to whichever mode is set last. (See "10.
Measuring Elevation".)
Storing setting out elevation
Step 6: Even after power off, elevation is stored.
Notes:
DL502-503.book 47 ページ 2010年4月5日 月曜日 午前9時47分

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Topcon DL-502 and is the answer not in the manual?

Topcon DL-502 Specifications

General IconGeneral
BrandTopcon
ModelDL-502
CategoryLaser Level
LanguageEnglish

Related product manuals