EasyManua.ls Logo

Topcon GR-5 - Step 4: Collect Data (for Base and Rover)

Topcon GR-5
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Post-Processing Survey
P/N 7010-1022 www.topconpositioning.com
39
to the Slant Height Measurement Mark (SHMM) on
the side of the enclosure.
2. Record the antenna height, points name, and start
time in the field notes.
Step 4: Collect Data (for Base and Rover)
1. Turn on the receiver. The STAT (status) light
(LED) initially blinks red.

Table of Contents

Other manuals for Topcon GR-5

Related product manuals