EasyManua.ls Logo

Topcon GR-5 - Charging the Batteries

Topcon GR-5
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RTK Survey
P/N 7010-1022 www.topconpositioning.com
43
2. After creating a job with the desired configuration
in TopSURV, you can begin the survey.
Job configuration settings will be applied to the
Base receiver only after starting the Base and to the
Rover receiver only after selecting a survey option.
NOTICE
For more details about how to create and
configure a job, start the GR-5 as a base or
rover receiver in RTK and other survey
methods, see the TopSURV User’s Manual.

Table of Contents

Other manuals for Topcon GR-5

Related product manuals