EasyManuals Logo

Topcon Net-G3 User Manual

Topcon Net-G3
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #35 background imageLoading...
Page #35 background image
P/N 7010-0935
2-1
Pre-setup Preparation
Successful deployment and operation of a Reference Station system
with the Net-G3A receiver requires careful site planning, feasibility
studies, and proper equipment configuration. These factors are critical
to maximize the performance of the Net-G3A and to seamlessly
integrate the receiver into an existing network or in establishing a new
network.
Once a location for the Net-G3A has been determined, you can begin
installing the hardware and software required to configure and
maintain the Net-G3A. After determining the application, use the
selected software to configure the receiver for your application.
Finally, collect almanacs and ephemerides to begin working with the
Net-G3A in its intended application. The following sections describe
these steps in detail:
“Determining the Reference Station Site” on page 2-2
“Installing Topcon Software” on page 2-5
“Installing the CF Card” on page 2-8
“Installing the USB Mass Storage Device (UMS)” on page 2-9
“Powering the Receiver” on page 2-11
“Charging the Backup Batteries” on page 2-13
“Collecting Almanacs and Ephemerides” on page 2-14
“Connecting the Receiver and a Computer” on page 2-15
“Power Management” on page 2-24
Net-G3A_OM_Book.book Page 1 Thursday, May 14, 2009 8:49 AM

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Topcon Net-G3 and is the answer not in the manual?

Topcon Net-G3 Specifications

General IconGeneral
BrandTopcon
ModelNet-G3
CategoryReceiver
LanguageEnglish

Related product manuals