EasyManua.ls Logo

Toro 41086 - Initially Field-Testing the System

Toro 41086
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Note:Thepumpshouldincreasethepressureuntil
itreachesthedesiredrateifaSelfTestspeedhas
beenentered.
13.TurntheMasterBoomControl(foot)switchtothe
Offposition.
Note:Thesystemstopsthepump.
14.TurntheAgitationswitchtotheOnposition.
Note:Thesystemstartsthepumpandincreases
thepumpspeeduntilthepumpreachesthepreset
agitationpressure.Thesystemgoestothispressure
whentheboomsareoffandthepumpandagitation
areon.
15.TurntheAgitationswitch,andthePumpswitch
totheOffposition.
InitiallyField-testingthe
System
Beforeoperatingthespraysystem,performthis
procedure.
1.Drivethevehicleatthedesiredsprayingspeedwith
thesprayerboomsoff.
2.Pressthe[Speed]keytoverifythespeedreadout.
3.TurntheSpraypumpcontrolswitchtoRate1.
4.TurnthePowerswitchtotheOnposition.
5.TurntheFootswitchtotheOnposition.
Note:UsetheFootswitchwhenallthebooms
aretobeturnedon.
6.EnsurethattheBoom1,Boom2,andBoom3
switchesareintheOnposition.
7.SettheMan/RateswitchtoRate1.
8.Increaseordecreasethevehiclespeedby1mph
(2km/h).
Note:Thesystemshouldautomaticallycorrect
thetargetapplicationrate.Ifthesystemisnot
correctingtheapplicationrate,reviewtheInitial
SystemSetup;thenrefertoTroubleshooting.
9.Aftersprayingaswath,switchthefootswitchtothe
Offpositiontoshutoffthesprayowtoallbooms.
Note:Thisalsoshutsofftheacreagetotalizer.
10.Verifytheareacoveredandthevolumeofmaterial
sprayed.
16

Related product manuals