EasyManua.ls Logo

Toro 74142TE - Adjusting the Tracking; Checking the Tire Pressure; Checking the Wheel Lug Nuts

Toro 74142TE
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AdjustingtheTracking
1.Disengagetheblade-controlswitch(PTO).
2.Drivetoanopen,atareaandmovethemotion-control
leverstotheNEUTRAL-LOCKposition.
3.MovethethrottlemidwaybetweentheFASTandSLOW
positions.
4.Movebothmotion-controlleversforwarduntilthey
bothhitthestopsintheT-slot.
5.Checkwhichwaythemachinetracks.
6.Ifthemachinetrackstotheright,loosentheboltsand
adjusttheleftstopplaterearwardontheleftT-slot
untilthemachinetracksstraight(Figure55).
7.Ifthemachinetrackstotheleft,loosentheboltsand
adjusttherightstopplaterearwardontherightT-slot
untilthemachinetracksstraight(Figure55).
8.Tightenthestopplate(Figure55).
Figure55
Leftcontrollevershown
1.Controllever3.Stopplate
2.Bolt
CheckingtheTirePressure
ServiceInterval:Every50hours/Monthly(whichever
comesrst)
Maintaintheairpressureinthefrontandreartiresat90kPa
(13psi).Uneventirepressurecancauseunevencut.Check
thetireswhentheyarecoldtogetthemostaccuratepressure
reading.
Figure56
CheckingtheWheelLugNuts
ServiceInterval:Aftertherst8hours
Yearly
Checkandtorquethewheellugnutsto122to136N∙m(90
to100ft-lb).
43

Table of Contents

Related product manuals